Concrete Calculator

Find how much concrete to order for a slab, footing, post hole, stairs or curb, how many bags to buy and what it will cost.

More options
What are you pouring?

Patios and paths are usually 4 in (10 cm); driveways 5–6 in (12–15 cm).

pours

For example 12 post holes or 3 matching slabs.

%

5–10% is usual; more on uneven ground.

Show volume in

Full trucks carry about 8–10 cu yd (6–8 m³). Ask your supplier.

Cost (optional)
$
$
Mixing your own (cement, sand and gravel)

0.45–0.55 is typical. Less water makes stronger concrete.

Steel reinforcement (slabs and footings)
ResultUpdates as you type—Concrete to order (with 10% extra)—Cubic metres—Cubic feet—Exact volume, no extra—Bags of 80 lb mix—Ready-mix trucks—Weight once poured (about)Pre-mix bags needed (approximate yields)

How your concrete is worked out

Volume = length × width × thickness, plus a little extra, then ÷ what one bag makes.

  1. 1

    Sizes in feet

    10 ft, 10 ft4 in = 0.333 ft

  2. 2

    Find the volume

    10 × 10 × 0.333= 33.33 cu ft

  3. 3

    Add 10% extra

    33.33 × 1.1= 36.67 cu ft= 1.36 cu yd

  4. 4

    Count the bags

    36.67 ÷ 0.6= 61.1, round up= 62 bags of 80 lb

Read more: the formulas for every shape, a worked example, bag yields and mixing your own

Concrete is sold by volume, so the job is to find the volume of your shape, add a little extra for spills, uneven ground and forms that bow out, and then divide by what one bag makes or what one truck carries.

The formula

slab, footing or wall = length × width (or height) × thickness
column or hole = π × (diameter ÷ 2)² × height
tube = π ÷ 4 × (outside diameter² − inside diameter²) × height
stairs = width × run × rise × (1 + 2 + … + steps) + width × landing × rise × steps
curb and gutter = (curb depth × (curb height + flag thickness) + gutter width × flag thickness) × length
to order = volume × (1 + extra % ÷ 100)
bags = volume to order ÷ what one bag makes, rounded up
cubic yards = cubic feet ÷ 27 · cubic metres = cubic feet × 0.0283

Worked example

A slab 10 ft long, 10 ft wide and 4 in thick. 4 in is 4 ÷ 12 = 0.333 ft, so the volume is 10 × 10 × 0.333 = 33.33 cu ft. Adding 10% extra gives 33.33 × 1.10 = 36.67 cu ft, which is 36.67 ÷ 27 = 1.36 cu yd (1.04 m³). An 80 lb bag makes about 0.60 cu ft, so you need 36.67 ÷ 0.60 = 61.1, rounded up to 62 bags. With 60 lb bags (0.45 cu ft each) it is 36.67 ÷ 0.45 = 81.5, so 82 bags. The slab itself is 0.944 m³ and weighs about 0.944 × 2,400 = 2,265 kg (about 4,990 lb).

What one bag makes

BagMakes aboutBags per cu ydBags per m³
40 lb0.30 cu ft90118
50 lb0.375 cu ft7295
60 lb0.45 cu ft6079
80 lb0.60 cu ft4559
20 kg9.4 litres82107
25 kg11.7 litres6686
40 kg18.7 litres4154

US bag yields are the ones printed on common ready-to-use concrete mixes (80 lb ≈ 0.60 cu ft). Kilogram bags use the same yield per kilogram (about 0.47 litres per kg). Bags per cu yd and per m³ are rounded up. Brands and products differ, so check the bag. Checked 10 October 2026.

Bags or ready-mix?

  • Under about 1 cu yd (0.75 m³), bags are usually cheaper and easier. Above that, mixing by hand gets hard work fast: 1 cu yd is 45 bags of 80 lb.
  • Ready-mix suppliers often charge a "short load" fee for small orders, so check their minimum.
  • Order a little more than you need. Running short in the middle of a pour leaves a weak joint.

Mixing your own: cement, sand and gravel

The dry materials shrink when water is added, as the sand fills the gaps between the stones. So you need about 1.54 times the wet volume in dry materials. That is split by the mix ratio. For 1 m³ of a 1:2:4 mix: dry volume 1.54 m³, 7 parts in all, so cement = 1.54 × 1 ÷ 7 = 0.22 m³ = 0.22 × 1,440 = 316.8 kg (7 bags of 50 kg, as 6.3 rounds up), sand = 0.44 m³ (about 704 kg), gravel = 0.88 m³ (about 1,320 kg) and water = 316.8 × 0.5 = about 158 litres.

The 1.54 factor and the densities used (cement 1,440 kg/m³, sand about 1,600 kg/m³, gravel about 1,500 kg/m³, concrete 2,400 kg/m³) are typical rule-of-thumb figures. Real values change with moisture and the stone size. The grade names next to each mix (M10 to M25) are the usual nominal mixes; structural work should follow an engineer's design.

Rebar and mesh

For a rebar grid, bars run both ways, set in from the edges by the cover. The number of bars in one direction is the inside width ÷ spacing, rounded down, plus one. Add extra for laps where bars join (often 40 bar diameters), and for bent ends. For mesh, sheets = slab area × (1 + overlap %) ÷ sheet area, rounded up.

Common questions

How do I calculate how much concrete I need?

Multiply length × width × thickness, all in the same unit. A slab 10 ft by 10 ft and 4 in thick is 10 × 10 × 0.333 = 33.33 cu ft. Add 10% extra to get 36.67 cu ft, then divide by 27 for cubic yards: 1.36 cu yd.

How many bags of concrete do I need?

Divide the volume you're ordering by what one bag makes and round up. An 80 lb bag makes about 0.60 cu ft, so 36.67 cu ft needs 62 bags. With 60 lb bags, which make 0.45 cu ft each, it's 82. Brands differ, so check the bag.

How many 80 lb bags of concrete are in a cubic yard?

About 45. An 80 lb bag makes about 0.60 cu ft and a cubic yard is 27 cu ft. A 60 lb bag makes 0.45 cu ft, so it takes 60 of those, and with 40 lb bags it takes 90.

Should I use bags or ready-mix concrete?

Under about 1 cu yd (0.75 m³), bags are usually cheaper and easier. Above that, mixing by hand gets hard work fast, since 1 cu yd is 45 bags of 80 lb. Ready-mix suppliers often charge a short load fee for small orders, so check their minimum.

How much cement, sand and gravel do I need for 1 m³ of concrete?

For a 1:2:4 mix you need about 1.54 m³ of dry materials: roughly 316.8 kg of cement (7 bags of 50 kg), 0.44 m³ of sand and 0.88 m³ of gravel, with about 158 litres of water. These are rule-of-thumb figures; structural work should follow an engineer's design.

How much extra concrete should I order?

Order a little more than you need; the calculator starts at 10% extra. Running short in the middle of a pour leaves a weak joint. The extra you choose is added before bags, trucks and cost are worked out. Change it to suit your job.

Related calculators

Concrete footing calculatorStrip, pad, round and bell-bottom pier footings: cubic yards or m³, bags, trucks, wall on footing, steps, digging, gravel, rebar, cost and width from soil bearing.Rebar calculatorRebar for slabs, footings, columns and beams: bars each way, ties, laps, stock bars of 12 m or 20 ft to buy, weight in kg or lb, cost, chairs, tie wire and a bar bending schedule.Square footage calculatorArea of rooms and plots in sq ft, m², sq yd, acres and more: any shape, feet and inches, cut-outs, waste and cost.Gravel calculatorGravel, stone, sand, or topsoil for any shape: cubic yards or m³, tons or tonnes, bags, truck loads and cost.

Made by Zulu Calculator, part of AlphaZulu LLC. Formulas are shown in full and rule figures are checked against official sources; see how we build calculators.

Embed this calculator on your site

Free to use on your website or blog. Paste this code where you want the calculator to appear. Please keep the credit link.

Concrete calculator by Zulu Calculator ↗